Inspection method of plastic spraying product structure .
Update:Jan 19,2023
Summary:Inspection method of plastic-sprayed product structure: after the plastic-sprayed product is sent for inspection, try to install one with correspondin......
Inspection method of plastic-sprayed product structure:
after the plastic-sprayed product is sent for inspection, try to install one with corresponding semi-finished products to verify the correct structure of the product, and it is required that the plastic-sprayed product is easy to install. Semi-finished products for trial installation should be installed with holes that are not offset, screws that can be fastened in place and not skewed: the position, height and clearance of devices exposed outside the plastic-sprayed products should be appropriate; It is not allowed to offset against the edge of the product hole or even expose the plastic-sprayed product, and the upper and lower covers are closely matched, which is convenient for installation and disassembly; The riveting sleeve in the plastic spraying product is not allowed to loosen or even fall off. If the trial assembly is qualified, the next working procedure can be continued, otherwise it will be judged as unqualified.